Solutions Library

Case Studies

Filter your results by:

Aggreko Creates Innovative Power Solution for Electrical Contractor's Client

During the construction phase of a new high-performance auto development facility, the local utility was unable to provide enough power to test high-power racing engines. The electrical contractor contacted Aggreko for the solution.

Aggreko Helps a Major Refinery Maintain Production During Seasonal Shutdown

A major refinery needed a way to maintain desired production rates during a seasonal shutdown of its fluidized catalytic cracking unit (FCC) for inspections and repairs. Aggreko had the answer.

When an Ice Storm Struck, a Manufacturing Facility Needed Power Fast

A leading OEM to major auto manufacturers serves a demanding market. So, when an ice storm cut off power to its plant – they had to get back up and running fast and Aggreko helped make it happen.

Mechanical Contractor Entrusts It's Reputation to Aggreko

One of the largest HVAC, plumbing and electrical contractors on the East Coast approached Aggreko to assist in developing integrated solutions for its clients.

Aggreko Provides 100% Oil-Free Air for Critical Pipeline Repair Project

When a company found that its pipeline system that was in service had developed leaks, immediate attention was required. Aggreko was called in to develop a solution.

Through Five Tournaments, Aggreko Never Drops a Stroke

With years of experience in the golf circuit, trusted responsiveness and local availability, Aggreko was chosen to provide power and cooling for each of these 5 Hawaiian golf events.Visit Aggreko.com for more information

Aggreko Keeps Hospital's Patients Safe and Comfortable During HVAC System Upgrade

Ensuring uninterrupted patient care was a top priority, so a reliable temporary cooling system was critical. To meet its stringent requirements, the hospital turned to Aggreko.

Aggreko Comes Through When Hospital's Chiller Breaks Down

When one of three critical chillers went out at a hospital, the mechanical contractor had to act fast to prevent an emergency situation for the hospital’s patients. They turned to Aggreko for help.

Aggreko Puts Standby Cooling in Place Fast for a Leading Telecom Provider

When a top telecom provider serving millions of customers suspected its central cooling system was in jeopardy, the company couldn’t wait for an actual failure to act, so they called Aggreko to install a standby system – fast.

Aggreko Performs Like a True Champion at the World Championship of Cricket

The Aggreko Event Services team considered the World Championship of Cricket to be one of the most challenging events ever faced in terms of logistics and planning complexity.