Macedonian Army Case Study
Camp power for the German Army in Macedonia
The challenge to the customer
The German Army representation in Kosovo found itself in a
difficult environment. It needed to set up a total of 14 camps,
some of which were situated in mountainous areas (altitude: 1500m /
4,900 ft) and extreme weather conditions of –15 to 35°C (–5 to
95°F).
Aggreko's solution
Aggreko supplied a full turnkey installation totaling 28 mW,
tailored for each individual camp.
The benefits to the customer
A full operations and maintenance service with onsite 24-hr
assistance was provided by our highly qualified and trained
professionals to ensure a continuous and reliable power supply.