Full productivity during scheduled shutdown
Client: Plastics Producer
Location: Northeast, USA
Sectors: Manufacturing
The Challenge
Crucial maintenance without taking a hit
This plastics plant has to run around the clock, all year round, to supply its customers in 26 countries, so the slightest holdup can spell disaster. When maintenance time rolled around, this created a dilemma: how to do this without shutting down?
Key Facts
The Solution
Utilities secured with vital power and cooling
To avoid downtime, we designed, tested and set up a package that let the plant shift to backup facilities with zero interruption to normal manufacturing. This comprised 100 tons of cooling, compressed air, generator power and distribution.
Aggreko
The Impact
Uninterrupted production throughout shutdown
The maintenance shutdown had no impact on production schedules, ensuring the plant continued to meet all deadlines and had no loss of revenue. This was secured through our seamless service, top-notch equipment, and round-the-clock support.