Skip to main content
Data centre construction Data centre construction

Data Center Construction

Power, heat, dry and cool your data centers build.

You can’t always rely on the grid to power all your construction, heating, drying and climate control needs. But you can always depend on our mobile and modular solutions.

How can we support data centers construction? 

  • We can provide prime power when there is no grid connection
  • We can synchronize our generators and batteries to the grid
  • Panels, Transformers and switchgear distribute the power where it is needed
  • Innovative load on demand packages minimize costs and impact on the environment
  • Super silent generators, manufactured with sound-proofing and noise-reducing measures for urban areas
  • Use our climate control solutions to cure the concrete, dry walls and keep areas dust-free
  • Maintain humidity levels for safe installation of critical equipment and protection of equipment warranties
  • Temperature control equipment keeps workers comfortable and safe

Temporary power for new build data centers

Building more flexibility into data centers construction

In the construction phase, we can supply reliable power for even the most complex site using our efficient, modular generators. You can choose from diesel, gas or alternative fuels running on HVO, GTL and other biofuels. There’s no need to worry about fuel supply either. We can manage that too, ensuring you have maximum uptime.

Experts in temporary power and temperature control solutions

No matter the project, or rental services will meet your needs

Partner with Aggreko for data center solutions at every stage of the lifecycle

We provide a full range of rental equipment that includes: