German Army | Case Study | Aggreko

Camp power for the German Army in Macedonia

The Challenge to the Customer

The German Army representation in Kosovo found itself in a difficult environment. It needed to set up a total of 14 camps, some of which were situated in mountainous areas (altitude: 1,500 m / 4,900 ft) and extreme weather conditions of –15C to 35C (–5F to 95F).

Aggreko's Solution

Aggreko supplied a full turnkey installation totalling 28 MW, tailored for each individual camp.

The Benefits to the Customer

A full operations and maintenance service with onsite 24-hour assistance was provided by our highly qualified and trained professionals to ensure a continuous and reliable power supply.

armeesfatsic1-009_opt_v_Variation_2.jpg

Aggreko supplied a full turnkey installation totalling 28 MW, tailored for each individual campContact us to find out more