55th Presidential inauguration
Aggreko chosen to power the 55th Presidential
inauguration
The challenge for the customer
This hugely high profile event
required absolute reliability and meticulous planning. 16MW
of electrical
power and high specification electric
heaters were required. Secure electric power to drive
military command stations, media centres and other essential
services was needed.
Aggreko’s solution: rental power package
Aggreko provided a 16MW power
package. Management services were built on the experience and
trust gained from providing power for every
inauguration since 1992.
The benefits to the customer
Literally millions of people were
able to watch the event on television across the World.
Media and TV centres captured the occasion, and the other
infrastructure services were powered without interruption.
Those lucky enough to attend in person were protected from the
chill of a Washington winter.