Russian Power St Case Study
Russian Power Station for leading manufacturer
The challenge to the customer
A world leading manufacturer of wood-based flooring embarking on
a project to construct a large new production plant near Moscow
needed a temporary power
supply because there was no local utility supply near the
production plant.
Aggreko's solution: temporary power station
Aggreko successfully provided a temporary power
station of 7 MW at 10kV to provide production capabilities
throughout the sub zero temperatures of Russia’s harsh winters.
Despite the extreme cold temperatures (as cold as -25 degrees),
Aggreko’s power equipment performed successfully
for the duration required (November 2003 until January 2005).
The benefits to the customer
Aggreko’s temporary power station
provided the customer with reliable and consistent
temporary power in order to maintain production. Without
the Aggreko temporary power solution, our client would have
been without production ability until the local utility could
provide a supply.