Aggreko Cooling Towers Substitute for Storm Damaged Plant
The Challenge for the Customer
A fierce tornado damaged one of six critical cooling towers at
an Oklahoma power station. The loss of the 115,000 GPM tower
was severely limiting power generation. The hot summer period
was a particular challenge. A speedy solution was essential
and a US$100,000 a day penalty was consequently part of the
contract.
Aggreko’s Solution
Working to schedule, within eight days Aggreko assembled a
temporary system. This project was comprised of 45
modular cooling tower
rentals, associated rental electrical
distribution and piping systems. The unique and
patented design allowed the towers to be located within
a limited space. The elevated cold water basin in the
design meant no additional pumps were required.
The Benefit to the Customer
The installation was a complete success. The plant was back
to normal production within eight days. Utility consumers were
assured of continued power supply for air conditioning and other
services.