Supplemental Cooling Towers
Productivity can suffer due to the limited capacity of permanent
cooling towers, especially during the hot summer months. Aggreko’s
temporary cooling towers can be used along with your permanent
cooling towers to increase capacity and reduce cold water
temperatures, keeping productivity at maximum levels.
There are two basic ways Aggreko provides supplemental cooling.
The first way to augment cooling tower capacity is by diverting a
portion of the hot water from the primary cooling tower, sending it
to the rental tower(s) where it is then cooled and redeposited into
the cold water basin of the primary tower.
Our experienced technical sales personal are equipped with the
necessary software to model the performance of the existing tower
and precisely determine the amount of augmentation required to
achieve the desired results. The water and thermal balance between
the primary and rental cooling towers are crucial to achieving the
best results.
Aggreko’s unique elevated water basin can supply up to 14 feet
of positive head that allows us to return the cooled water to the
basin of the primary cooling tower without the need for additional
pumping or the balancing and reliability nightmares that come with
operating a dual pumping system.
The second way Aggreko provides supplemental cooling is by
isolating a particular exchanger or group of exchangers from the
primary cooling tower and placing it on a rental tower(s) that is
sized specifically to achieve the ideal temperatures. When a
particular exchanger, or group of exchangers, is limited by
temperatures and water flow, temporary cooling towers can supply
the cool water needed for optimum performance. ACTS can isolate
those units and complement them with temporary cooling towers so
that the lack of cool water is not an issue.
This process not only provides benefit to the isolated
exchanger(s), but, by reducing the heat load and water flow
requirements of the primary cooling tower and pumps, the water
temperature to the remaining exchanger(s) is reduced and water
flows are improved, achieving a more desirable operating
condition.
For more information on our cooling
tower supplemental cooling options please contact us.