Client:<span style="color: var(--bs-body-color); font-family: var(--bs-body-font-family); font-size: var(--bs-body-font-size); text-align: var(--bs-body-text-align);">Leading data centre provider<br></span><span style="color: var(--bs-body-color); font-family: var(--bs-body-font-family); font-size: var(--bs-body-font-size); text-align: var(--bs-body-text-align);">in the Philippines</span>

Location:Biñan, Philippines

Sectors:Data centres

Key Facts

3x3 MVAemergency generators tested
3x1.2{2DC79272-84A9-42C6-B29F-3276C50C2478}loadbanks used
1x4,000 Adistribution board
1x2,000 Adistribution board
Download PDF Case Study
DC_PHILIPINES_2

THE SOLUTION

Seamless testing with a phased approach

Aggreko got to work and supplied three 1,266 kW loadbanks and two distribution boards – one 4,000 A board and one 2,000 A board. Ten Aggreko expert engineers were on site during installation to make sure the project went smoothly and a further two team members were involved in the testing phase. Our team utilised 74 pieces of 30 m x 240 mm² low-voltage cables throughout the project, to make it as effective and efficient as possible. As an added bonus, we had already worked with the client previously, meaning we understood their needs and concerns.