Testing a data centre's backup power
- THE CHALLENGE
Urgent demand for loadbank testing for diesel generators
- THE SOLUTION
Seamless testing with a phased approach
- THE IMPACT
Delivering results and meeting deadlines
Client:<span style="color: var(--bs-body-color); font-family: var(--bs-body-font-family); font-size: var(--bs-body-font-size); text-align: var(--bs-body-text-align);">Leading data centre provider<br></span><span style="color: var(--bs-body-color); font-family: var(--bs-body-font-family); font-size: var(--bs-body-font-size); text-align: var(--bs-body-text-align);">in the Philippines</span>
Location:Biñan, Philippines
Sectors:Data centres
Key Facts
THE SOLUTION
Seamless testing with a phased approach
Aggreko got to work and supplied three 1,266 kW loadbanks and two distribution boards – one 4,000 A board and one 2,000 A board. Ten Aggreko expert engineers were on site during installation to make sure the project went smoothly and a further two team members were involved in the testing phase. Our team utilised 74 pieces of 30 m x 240 mm² low-voltage cables throughout the project, to make it as effective and efficient as possible. As an added bonus, we had already worked with the client previously, meaning we understood their needs and concerns.