ASC Shipbuilding Australia

Cooling two major warships during construction

Cooling two major warships during construction

  • The Challenge

    Provide a cool working environment on board two warships during construction

  • The Impact

    Productivity maintained and fuel consumption cut by 20%

  • The Solution

    Four 200kW chillers and 16 100kW air handlers

Client:Premier Australian naval defence contractor

Location:Osborne, South Australia

Sectors:Shipping

The Challenge

Keeping construction workers cool and productive

During the summer months, high temperatures can affect shipbuilders’ productivity. We had to find a reliable, efficient and cost-effective way to get cool air to them, in a number of different compartments aboard two 7000 tonne warships. Working on scaffolding added another layer of complexity.

Project Fact File

2 State-of-the-art7000 tonne Air Warfare Destroyers
200kWUnits used to cool compartments
0%Loss of productivity
20%Cut in fuel consumption
Cooling solutions for the military ship

The Solution

A bespoke answer for a unique site

We created a bespoke system using four 200kW chillers and 16 100kW air handlers which were installed using ASC’s own cranes on site. As well as working around the unique nature of the construction site, the system was designed to be as efficient as possible – both to cut costs and minimise environmental impact. 

The Impact

Productivity protected, and fuel consumption cut

With productivity maintained and fuel consumption cut by 20%, our relationship with  ASC goes from strength to strength. Initially asked to cool one ship, the order was then doubled to two. We were also asked to supply two 350kVA generators for the first and second ship launches. 