Taken at sunrise

Power for construction of Taiwan's 900 MW offshore wind farm

Power for construction of Taiwan’s 900 MW offshore wind farm

Power for cable installation works
  • The Challenge

    Supplying temporary power for construction of an offshore wind farm

  • The Solution

    Reliable power package delivered

  • The Impact

    Cable installation schedule achieved without delays

Client:Van Oord

Location:Changhua County, Taiwan

Sectors:Utilities

The challenge

Supplying temporary power for 2 x 1500 kVA construction of an offshore wind farm

Situated between 35km and 60km off the west coast of Changhua County, Taiwan, Ørsted’s Greater Changhua 1 & 2a offshore wind farms holds a total capacity of 900MW. With 111 of 8 MW turbines installed on jacket foundations, the wind farm will produce sufficient renewable energy to meet the demand of nearly 1 million Taiwanese households annually.

In its construction phase, Ørsted’s contractor, Van Oord, required plenty of temporary power for their cable trencher. Without sufficient and reliable power, the installation and burial of the 111 inter array cables in between the wind turbines and the 3 export cables to the substations would be delayed. 

Key Facts

2 x 1500kVAGenerators
1 x 500kVAGenerator
440V3-Phase supplied
19WeeksOf reliable power supply
Download PDF Case Study
Taiwan Greater ChangHua Wind Farm project

The Solution

Reliable power package delivered

 

Aggreko has a local dedicated Wind Energy Team with experience serving the wind farm industry.

Our engineers are familiar with seasonal power and temperature control requirements of the industry. We also provided technical advice for the planning, delivery and servicing of the generators.

 


 

The Impact

Cable installation schedule achieved without delays

Our reliable generators and dedicated personnel facilitated the installation and burial of the 111 inter array cables in between the wind turbines and the 3 export cables to the substations.

Aggreko’s planning and dynamic approach helped the customer hit tight deadlines and contributed significantly to Taiwan’s transition to clean and green energy.

2017-02-turbines-at-offshore-windfarm.jpg
Tags
  • Utilities
  • Case Study
  • Asia
  • Renewable energy
  • Wind turbines