Client Major Steel Plant
Location Abu Dhabi, UAE
Sectors Manufacturing
The Challenge
Steel Plant needed temporary cooling to continue production
A major steel plant was experiencing problems with their permanent cooling towers. This meant that they had to be shut down for repair and maintenance, which would cause serious delays in their production schedule there-by facing financial loss.
Project fact file
Cooling provided
Flow rate
Water cooled down
The Solution
Aggreko provided cooling in phases as per the plants shutdown schedule
Our specialist temperature control team designed and developed a reliable, cost effective cooling solution capable of delivering 20 MW of cooling tower package in phases. Aggreko team installed two 10 MW cooling tower packages complete with ancillaries at different time schedules to fulfill the changing requirements of the maintenance and repair schedule of the plant
the aggreko difference
Our specialist engineers are experts in developing unique solutions to help you
The Impact
Plant operations continue effortlessly
Aggreko’s unique solution of providing cooling in different phases enabled the customer to overcome the problem and provided the necessary cooling of process water from 58ºC to 50ºC allowing them to continue the production without any stop to the plant
How can we help you?
Get in touch and we’ll help find what’s right for you