Data Centre Construction

Power, heat, dry and cool your data centre build.

You can’t always rely on the grid to power all your construction, heating, drying and climate control needs. But you can always depend on our mobile and modular solutions.

How can we support data centre construction?

    • We can provide prime power when there is no grid connection
    • We can synchronise our generators and batteries to the grid
    • Panels, transformers and switchgear distribute the power where it is needed
    • Innovative load on demand packages minimise costs and impact on the environment
    • Super silent generators, manufactured with sound-proofing and noise-reducing measures for urban areas
    • Use our climate control solutions to cure the concrete, dry walls and keep areas dust-free
    • Maintain humidity levels for safe installation of critical equipment and protection of equipment warranties
    • Temperature control equipment keeps workers comfortable and safe
    Data Center IT Specialist and System administrator Talk, Use Tablet Computer, Wearing Safety West. Server Cloud Farm Facility with Two Information Technology Engineers checking Cyber Security.

    Uptime on the line: Energy challenges in European data centres

    Download our report for free

    Explore the latest insights and strategies to maintain uptime and resilience in your data centre. Our report "Uptime on the Line" offers valuable recommendations from industry experts, based on extensive market research conducted by Aggreko. Discover more on Aggreko’s latest report.

     

    Rental equipment for power and temperature solutions

    Keeping you online with 360º data centre support