To keep a hospital powered up during vital redevelopment

Shepparton hospital, in regional Victoria, required an expansion to its current facilities, but construction work on this scale had the potential to disrupt fundamental operations within the building.

Lend Lease, the company responsible for the expansion, needed a partner to supply an uninterruptible power source for the hospital.

A break in power could have catastrophic consequences, but we had the perfect solution to the challenge.

Project fact file

4 Kms

Amount of cabling

24/7 Remote monitoring

Of equipment and power levels

1380 kVA

Power on standby

4520 kVA

Power supplied

The solution

Our reliable power, expert planning and constant monitoring

We know that planning is key. Our experts visited the site on multiple occasions and worked closely with the electrical contractor and our customer to guarantee the perfect power package for the project.

Our innovative Aggreko Remote Monitoring (ARM) technology was put to great use, keeping a close eye on power supply levels and ensuring all operations were optimised.

The Aggreko difference

We keep you switched on when it matters most

The impact

Critical care for patients continued uninterrupted

Our reliable power and contingency measures allowed the hospital to continue unabated by the ongoing construction work. This meant that patients could receive the vital care they required.