The challenge

Cooling down hot hydrotreated gas oil 

A Western Canadian oil refinery needed to maximize their overall summer production to keep up with the seasonal demand. In order to do so they would need to operate at 40 percent over their boilerplate capacity. However, they faced a challenge in reaching that production capacity  with their  hydrotreated gas oil (HGO) stream temperatures exceeding the 107°F (45°C) pipeline specifications.

They needed to quickly find a reliable way to bring those temperatures down to meet their demands, so they called on Aggreko.

 

Project fact file

15%

Increase in flow rate

6 weeks

Turnaround time from initial call

 
The solution

A complex, custom design backed with expertise

As time was of the essence, our Aggreko Process Services (APS) engineers designed a complete kit consisting of refinery grade shell and tube heat exchangers, cooling towers, pumps and the necessary cabling to connect it all together. 

Additionally, we provided an onsite certified technician to ensure the our equipment performed at peak efficiency.

 

the aggreko difference

We solve the problem you didn't even know you had.

 
The impact

Simultaneously scaling up production and profits

The system worked perfectly increasing flowrate of blend by 15 percent, and product output by 6,040 barrels per day. With our help the customer was able to manage HGO temperatures allowing them to meet product demands and significantly increase their revenue.

 

“You can rely on us to draw up the most effective solution for your business”