Data center construction

Technicians on site with generators in background

TEMPORARY Power for new build data centers

Building more flexibility into data center construction

Building more flexibility into new data center construction. We manage all your energy needs to ensure that you have maximum uptime. We supply reliable power for even the most complex construction sites using our efficient, modular generators. There’s no need to worry about fuel supply. You can choose from diesel, gas or alternative fuels running on HVO, GTL and other biofuels.

How Can We Help?

We can power, heat, dry and cool your data center build.

You can’t always rely on the grid to power all your construction, heating, drying and climate control needs. But you can always depend on our mobile and modular solutions. 

How can we support data center construction?

  • We can provide prime power when there is no grid connection.
  • We can synchronize our generators and batteries to the grid.
  • We supply panels, transformers and switchgear distribute the power where it is needed.
  • We minimize costs and environmental impact through our innovative load on demand packages.
  • We keep it quiet with our super-silent generators, soundproofed, and manufactured with and other noise-reducing measures for urban areas.
  • We keep your construction dust-free with our climate control solutions to cure the concrete and drywalls.
  • We control moisture and humidity levels to safely install critical equipment and protect their warranties.
  • We control construction site temperatures to keep workers comfortable and safe.

 

Talk to us about your project.

Whether you’re constructing a server room or a hyperscale data center, we have the expertise and solutions to power your project.