Client International construction company
Location Bilbao, Spain
Sectors Construction
The challenge
Modular power for two pontoons to reshape river
An international construction company was hired to remodel sections of the Bilbao river riverbanks. This would shrink the width at certain parts of the river – but moving earth and water of such volume is far from routine.
The project required two large pontoons, but in order to move the pontoons to the various lengths of river, power would be needed. Reliable, mobile, modular power.
Project fact file
Length of project
Lost to delays
Total power needed
The Solution
A rapid response and 600 kVA of power for project
After consulting with our customer, we devised a solution that would provide the pontoons with the necessary power to get the project moving.
Our equipment is mobile and modular, contained within 20ft ISO standardised containers. This makes all manner of sites, locations and requirements accessible.
This was the case with the pontoons too. We rapidly deployed two generators, totalling 600 kVA. This level of power proved to be more than sufficient in enabling the pontoons to reshape the Bilbao river.
The Aggreko Difference
We'll help you move the earth if you need us to
The Impact
River reshaped and project timelines achieved
The river was reshaped successfully, allowing plans to continue in the city and surrounding areas.
For a project of this scale to be completed on time is impressive, and we played our part to ensure our customer stayed on track with targets and completion.