Client Strike Energy

Location Australia

Sectors Oil and gas

 
The challenge

Ground-breaking drilling campaign in remote location needs cost-effective power

The Cooper Basin in South Australia is one of the most productive sites for oil and gas, and has the capacity to ease a looming gas shortage in Eastern Australia.

To find out if Strike Energy’s Cooper Basin Project had the gas reserves to bridge this impending energy fuel gap, the customer drilled one of the most technically advanced horizontal Coal Seam Gas wells - deeper than any completed in Australia before.

The site is extremely remote, with no grid energy within it.

For this plan to succeed, the customer needed a reliable, safe and flexible power solution, coupled with an experienced provider to partner with.

 

Project fact file

2.8 km

Depth of vertical well

3400 kVA

Power generated

 
The solution

A comprehensive strategy and reliable equipment to deliver efficient power and flexibility

With no grid facility, the power supply needed, above all else, to be as reliable as possible, so operations could continue without interruptions to the critical dewatering process.

Having vast experience supporting oil and gas sites, our engineers and operations teams worked closely with Strike to design and set up a flexible power supply that included redundancies, which could produce reliable power safely for operations, mess facilities and the gas well dewatering systems during the various phases of the operation’s life cycle.

With circumstances constantly changing, Aggreko provided the flexibility to meet operational requirements within a short reaction time.

 

Our Difference

We help you drill longer and deeper

 
The impact

Search for viable clean energy sources can continue unabated

With the target depth successfully reached, testing has commenced, and gas reservoirs can potentially be accessed, lowering the possibility of a gas supply shortfall

 

Tell us what you need

We’ll help you find what’s right for you