Case Studies
This hugely high profile event required absolute reliability and meticulous planning.
Tunnelling conditions in this time sensitive motorway project were causing difficulty.
An enormous electrically powered open cast excavator needed to move 25 miles from one mine to another.
Technical problems with on-board generators in this Gulf of Mexico based rig meant emergency shut-down.
A container ship en route between Singapore and Los Angeles required an additional back-up generator with its own fuel supply.
Electric motors driving fans at an Arizona mine were performing poorly.
Aggreko provided temperature control solutions for Alabama Grocery Distributor
After years of discussion, controversy and finally a decision, the Brent Spar was towed and dismantled in Norway with large parts of it used to build a roll-on, roll-off ferry quay structure.
Construction of pipelines to connect Chad to three new oilfields in the remote area of Cameroon, providing power solutions for productions areas