The Challenge

Delays to the Phakisa mine cooling system

Harmony Gold Mining Company had commissioned ice-making plants to cool their 2.4 kilometre-deep Phakisa mine. When they discovered the plants wouldn't be ready on time, they asked us to step in and find a way to bridge the gap, fast. With summer on its way, the mines wouldn't be safe without comprehensive cooling –but downtime would mean disaster for the business.

Project fact file

3,000 kWrCooling delivered with backup
3,700 kWrSurface-cooled plant
2.4 kmDepth of Phakisa gold mine
Zero downtimeWith our temporary cooling system
seriously, which is why we have brought in Aggreko to provide us with a turnkey package, which can be delivered quickly to the mine. The knowledge and experience Aggreko can provide in this area will play an integral part in the operation of the mine until the in-house cooling system is operational.

Product Design Engineer , Harmony Gold Mine Co. Ltd

Marius De Leeuw

Cobar Mine Cooling (AusPac) (2)

The Solution

A complete cooling package in days

Within days, we surveyed the site and delivered a complete, temporary cooling system, which would keep the mine in perfect operating conditions until the new plant could take over. Bringing in equipment from our South Africa depots meant we could get it on site quickly, and our technical team was on hand to operate the system until the new cooling plant came online.

The Impact

100% uptime and no loss of productivity

We're known for our local resources and expertise, and there's no doubt it made a huge difference here. With a large technical team and several local depots in South Africa, we were able to visit the site, design the right solution, deliver it, install it and have it up and running within days. We know the local infrastructure and work as an extension of our customers' team –an approach that gets the job done much faster, and saves our customers money time after time.