Any good solution starts with a firm understanding of all the requirements and additional areas of concern for the customer. This project was not short of communication, with lots of discussion on how the correct application could be applied in an environment laced with safety and security concerns.
From considering the unique requirements of the customer, Aggreko engineers showcased multiple designs, until an ideal solution and agreement was reached and we began developing the best all round turnkey solution.
We supplied an initial 15 MW of power and one year later added a further 10 MW of power, bringing the total to 25 MW. We purpose built a power plant with a bespoke built in switch gear to supply the required power to the refinery ensuring that production could continue.
The location of the site faced as many security challenges as the power challenge did. Following the refineries oilfield process and procedures as deemed a hostile environment, our site had to be external to the refinery meaning we needed to provide our own security including perimeter walls watch towers, and armed guards for 24/7 protection.
All personnel that work on the project site were also provided Hostile Environment Awareness Training (HEAT) This high level of safety training was delivered by an external security authorised training partner ensuring there was a firm understanding and governance among personnel.
The project has 11 dedicated technicians working on an 8 / 2 rotation and who live on the site 24/7. There are a further 18 people working on the project who form the rest of the workforce and are employed locally - including drivers, technicians, accommodation cleaners and cooks, a public relations officer and QHSE officer.
We trained the local workforce on our equipment and translated most training materials into Arabic to ensure its effectiveness.
The power plant was installed within just 13 days of the last equipment arriving at the local Iraq port, providing prime power to the refinery and operating on 24/7 basis.