With a tricky job on their hands, CCED turned to Aggreko as their trusted partner. With a history of reliable knowledge and a proven track record with flare-to-power projects, we were a natural choice. Aggreko implemented a power solution aimed at converting the flared gas into greener electricity. This project revolved around the implementation of modern gas capture and conversion technologies to reduce gas flaring and convert the gas into a more sustainable power source.
This was achieved by designing, building, operating, and maintaining two independent gas power plants within the larger operational framework of Blocks 3 and 4 of Oman, utilising 33MW of power at 33kV. In addition, the flexibility of the DBOOM (design, build, own, operate and maintain) contract shielded the client from high upfront costs and negated the risks associated with operating and running power plants.