- The Challenge
Keeping the plant’s output levels as high as ever - despite a shutdown
- The Solution
Full backup equipment and support from our team
- The Impact
Production stayed at 100% during 48 hour maintenance period
Client: Plastics Producer
Location:Northeast, USA
Sectors:Manufacturing
The Challenge
Crucial maintenance without taking a hit
This plastics plant has to run around the clock, all year round, to supply its customers in 26 countries, so the slightest holdup can spell disaster. When maintenance time rolled around, this created a dilemma: how to do this without shutting down?
The Solution
Utilities secured with vital power and cooling
To avoid downtime, we designed, tested and set up a package that let the plant shift to backup facilities with zero interruption to normal manufacturing. This comprised 100 tons of cooling, compressed air, generator power and distribution.
Aggreko
The Impact
Uninterrupted production throughout shutdown