2017-02-gold-nuggets.jpg

Solar Hybrid power cuts costs and emissions

Aggreko specialises in integrated solar/thermal hybrid power solutions that enable remote operations to significantly cut fuel costs by 12-13% and reduce carbon emissions by 10,000 tonnes annually, providing reliable and cheaper energy without upfront capital investment.

  • The Challenge

    Power a remote mine and lower power costs

  • The Impact

    Cheaper, reliable power - with lower emissions

  • The Solution

    One-stop for customer's power, thanks to our solar/thermal integration

Client:Bisha Mining Share Company / Nevsun

Location:Eritrea, Africa

Sectors:Mining

The Challenge

How Aggreko powered a remote mine and lowered costs

Our customer needed to lower their power costs to profitably convert their gold mining operations in copper and zinc. They were happy with the reliability of our containerised, mobile and modular diesel plant but were looking for ways to reduce their fuel costs.

They had been approached by 3rd party solar developers offering a lower cost of energy but they did not want to commit to a 20-year contract. They were also concerned about how solar intermittency could impact the reliability of the power station and who would ultimately be held responsible and accountable for their electricity supply. Having two different power suppliers did not seem ideal.

9HaFootprint of solar station
12-13%Fuel savings
7.5MWpSolar power capacity
22MWProduced by generators

Loading component...

Loading component...

Being in a remote location meant that finding a reliable power supply was a critical factor; however, Aggreko's lead time and modular flexibility fitted with our planning production schedule.

Customer,

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...