A cutting-edge, digitally controlled load testing solution ensured a new data centre in Indonesia met international commissioning standards. With 12 load banks streamlining the Integrated System Test (IST), the facility achieved Uptime Institute accreditation and was successfully commissioned.
  • The Challenge

    Commissioning protocol required advanced electrical and heat load testing for large data hall to international standards

  • The Solution

    Comprehensive, cutting-edge testing solution with digitally controlled solution and synchronisation

  • The Impact

    Uptime Institute accreditation met and data centre commissioned

Client:Asian-based Co-Location player

Location:Indonesia

Sectors:Data centres

Loading component...

1,450kWCapacity of new Tier III Data Centre
1,500kWLoad test
12 X 200kWDigital Heat Load Banks
350xServer racks
21 Daysof commissioning