Oil refinery industry at twilight

Cooling For Ethylene Plant

Ethylene plant needs fast emergency cooling

  • The Challenge

    Collapse in cooling tower has costly domino effect

  • The Solution

    60,000 tonnes of cooling and 12.3 MW of power delivered in six days

  • The Impact

    Emergency cooling saves refinery up to $5 million a day

Client:Gulf Coast ethylene plant

Location:USA

Sectors:Petrochemical and refining

The challenge

Stop domino effect of cooling tower collapse

At any processing plant, downtime is a big issue. When it costs $5 million a day, it becomes even more serious. A Gulf Coast petrochemical plant was faced with this costly headache when two cells collapsed in the cooling tower used for ethylene processing. 

Given that ethylene processing is the first and most important event in the petrochemical product chain, this disaster would have a domino effect throughout the entire plant. Feedstock to downstream units would be reduced by 20–40%, causing a massive economic impact. With repairs slated to take one month, the plant needed emergency back-up.

$5,000,000per day estimated cost of failure
60,000tonsCooling equipment
12.3MWPowering the package
9milesCable laid

Loading component...

The solution

Emergency cooling online in six days

At $5 million a day, the faster a fix is found, the better. We got to work straight away assessing the damage and installing temporary cooling. Given the size of the facility, this was no mean feat. In total, we shipped out 60,000 tonnes of cooling capacity – 30,000 tonnes for immediate use, the rest for back-up – and 12.3 MW of power, nine miles (14.5km) of cable, diesel tanks and more. And it took us just six days.

“When costs are quickly mounting, there’s enormous pressure to respond fast. Luckily, our ‘quick fix’ is always an exceptional one.”

,