Ensuring uninterrupted power supply during plant shutdown
Aggreko provided complete temporary power and temperature control solution, including complex task of cabling and equipment placement, handled the installation, commissioning, and electric work certifications for a leading pharmaceutical company.
Client: Leading pharmaceutical company in Asia
Location: Singapore
Sectors: Pharmaceuticals
The challenge
Overcoming complex demands during plant maintenance
Aggreko was tasked with providing temporary power solutions for the annual plant shutdown of a leading pharmaceutical plant in Singapore, where they undergo maintenance for essential equipment. The project spanned across four days, but mobilisation required an extensive preparation period of two weeks.
Given Aggreko's longstanding relationship with the customer, having provided reliable temporary power and temperature control solutions for the past six years, we were the go-to choice for this critical project.
The plant faced several significant challenges during this maintenance period. The complexity of cabling work and equipment placement was compounded by the warm and humid weather, making the usual installation work even more challenging.
This year, the requirement for temporary power and cooling solutions had doubled due to the addition of a new plant, adding to the complexity and scale of the project.
Key project facts
The Solution
Complete power and temperature control setup
Aggreko's engineering expertise and design capabilities were pivotal in overcoming the challenges presented by the project.
Our experienced contractors managed the groundwork efficiently, ensuring that all installations were carried out seamlessly.
By leveraging our extensive experience and reliable equipment, we provided the customer with a worry-free solution during their critical maintenance period.
To address these challenges, Aggreko provided a comprehensive suite of solutions which includes 40 diesel generators, 16 air conditioning units and one 750kW chiller. The team also took on the complex task of cabling and equipment placement, handled the installation, commissioning, and provided the necessary Licensed Electrical Work (LEW) certifications, ensuring all electrical work met safety and regulatory standards.
Our expertise enabled us to have the ability to conduct a detailed site survey, develop a tailored design proposal, and meticulously plan the fleet to meet the customer's needs.
The Impact
Worry-free plant maintenance
The project’s success not only met the operational requirements but also reinforced their confidence in Aggreko’s ability to deliver under challenging conditions. The customer was highly satisfied with the outcome, appreciating the smooth execution and our commitment to excellence throughout the project.
This project exemplifies Aggreko's ability to handle complex power and temperature control needs while providing exceptional service and support, solidifying our role as a trusted partner for temporary power solutions.