When The Grid Fails, Backup Power Saves The Day
When grid failures threatened a South African manufacturer's furnace operations, Aggreko deployed 5MW of backup power in just one week. We prevented downtime and saved the customer from potential losses of 1 million ZAR per day over seven months.
- The Challenge
Dehumidification capability was crucial for preventing formation of rust
- The Solution
Guaranteed safe, reliable backup power until grid problems resolved
- The Impact
Downtime avoided and major financial losses prevented
Client:Large producer of building systems and construction products
Location:South Africa
Sectors:Manufacturing