Manub-Sudan- 2688x1512

A futureproof power offering for a Sudanese gold mine

A reliable power solution delivered for an off-grid Sudanese gold mine through expert project management, ensuring continuous production and future hybrid expansion. This complex, two-phase installation showcased Aggreko's ability to provide scalable, efficient power in extreme conditions.

  • THE CHALLENGE

    A quick power solution for an off-grid gold mine needing reliable power to push production

  • THE SOLUTION

    A two phase installation project involving complex project management to ensure smooth and continual power for the mine, including a future hybrid offering

  • THE IMPACT

    Expansion of the mine continuing without downtime and a hybrid addition, offering financial and environmental advantages

Client:Manub – Sudanese affiliate of Managem

Location:Wadi Gabgaba – Sudan

Sectors:Mining

Loading component...

13 xDiesel generators for phase one of a two phase project
1.2 MtProduction capacity per year
2-4 MWMWSolar hybrid offering for future commissioning

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...