Cool Tent Reduces Refinery Risk
Tent cooling system reduce refinery's risks
- The Challenge
Eliminate environmental and safety risks for removal of lead-based paint
- The Solution
70 tonnes of cooling in a sealed tent
- The Impact
Zero safety or environmental reports, cost savings for the customer
Client:Refinery
Location:USA
Sectors:Petrochemical and refining
The challenge
Risk-free conditions for lead paint removal
A major overhaul of a refinery is not an exercise to take lightly. Unexpected delays and safety hazards cost time, money and sometimes lives. Our customer was aiming for an incident-free overhaul, with zero environmental or safety reports. This meant they needed an unpleasant and potentially risky job done before they could even start. They wanted lead-based paint removed from one of their larger vessels so they could complete a welding project.
Others had tried dealing with this problem in the past but with only minimal success. The refinery asked if we could do a better job, and do it during normal operational hours.