Image of crane loading of metal steel rolls.

Maintaining metal production with precise power and temperature control

Arcelor Mittal's aging Belgian steel plant needed reliable power and temperature control to prevent production shutdowns from equipment failures and extreme weather. Aggreko's 15MW power and 12MW HVAC solution keeps steel production rolling year-round while protecting critical infrastructure.

  • The Challenge

    Devise solutions to provide reliable power and more for market leading manufacturer

  • The Impact

    Business as usual for customer

  • The Solution

    Expert power and temperature control to keep production rolling

Client:Global Steel Manufacturer

Location:Gent, Belgium

Sectors:Manufacturing

The Challenge

How Aggreko devised solutions to provide reliable power and more for market leading manufacturer

Arcelor Mittal is a world leading steel manufacturer and mining company. For the production of steel they are heavily dependent on their production plant, which was built around 50 years ago.

The age of the plant required an increase on maintenance, as production levels would suffer if the plant ground to a halt. Seasonal changes were also playing havoc, with vital components of the facility being adversely affected by the extreme temperatures.

What Arcelor Mittal needed was a specialist and a partner.

15MWGenerators per year
12MWHVAC equipment per year

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...