  • The Challenge

    Cost-effectively convert by-product into biofuel

  • The Impact

    Emissions reduced and $1m saved

  • The Solution

    Responsive, versatile, fuss-free and cleaner biogas power solution

Client:Leading energy company

Location:Chumpuang, Nakhonratsrima, Thailand

Sectors:Manufacturing

The Challenge

Cost-effectively convert by-product into biofuel for power supply and avoid CAPEX

A leading energy company prides itself as a clean power enterprise that strives to improve the environment and lives of the local community, by leveraging on their proprietary technology in waste to biogas conversion.

The company was looking for a biogas power solution partner to convert their generated biogas – a potential 120,000m2 per day - through its waste biofuel technology. Purchasing equipment was their initial approach but the long-lead time and high CAPEX was an issue.

It meant that the business had to wait, and delays mean lost revenue.

$1mUSD saved
120,000Nm3biogas converted per day
40,000 Cars Equivalent emission reduction
4xGas generators
6MWInstalled capacity

Loading component...

Loading component...

“By partnering with Aggreko, we were able to successfully scale-up our operating biogas project by adding power generation capacity in record time and at significantly lower capex than expected. Beating our expectations, the gen sets arrived to Thailand as fast as three weeks after signing the contract.”

Gustaf Godenhielm , Executive Chairman, Northern Biogas Limited

Loading component...

Loading component...

Loading component...

Loading component...