  • The Challenge

    Power huge new platform complex during its construction, Hook-Up and Commissioning

  • The Solution

    Multi-regional collaboration through meticulous planning and execution of a custom engineered temporary power solution

  • The Impact

    Reliable power delivered on time and safely to ensure project milestones were met

Client:Major oil and gas operator

Location:Singapore and North Sea, UK

Sectors:Oil and Gas

The challenge

Power huge new platform complex during its construction, Hook-Up and Commissioning

A complete power package was required for operating a remote offshore platform. Aggreko’s challenge was to design, project manage and operate a temporary power solution until permanent power could be bought online.

The first step would be to provide a temporary power supply during the onshore construction phase in Singapore. The complex features bridge linked platforms with temporary power required on each.

The customer needed a solution from start-to-end of the project until the operational phase. From the conceptual stages through to development, the customer needed a reliable engineering partner to design all of their temporary power needs.

3 x 1500kVADiesel generators
4.4 MVATotal power provided
1 x 2500kVATransformer