Drying out a construction site

Keeping a construction site on schedule

Client:Ashcourt Group

Location:Durham, England

Sectors:Construction

The Challenge

Fast drying a wet winter building site

A little rain never hurt anyone but a lot of bad weather can spell time delays and budget blowouts for a construction site. Ashcourt called us when they found themselves behind schedule on the construction of four student accommodation buildings. The interior had been exposed to the extremes of a Durham winter causing site workers frustrations and delay.

4 Buildings needed drying and heating
125kWModular mobile heater
30 kVAgenerator used to power the heater
2 hoursDurham's daily winter sunshine

Loading component...

The Solution

One modular mobile system for four buildings

We packaged up a 125 kW heater and ducting connected to a 30 kVA generator. This was linked to a 1,000 litre fuel tank to minimise the footprint. Because the equipment was modular and easy to move, we only needed one heater to dry out all four buildings.

“The solution meant we could meet project deadlines ahead of schedule despite the bad weather.”

Matt Tinker , Project Manager , Ashcourt Group