Drying out a construction site
Keeping a construction site on schedule
- The Challenge
Fast drying a wet winter building site
- The Impact
Project schedule and winter weather beaten
- The Solution
One modular mobile system for four buildings
Client:Ashcourt Group
Location:Durham, England
Sectors:Construction
The Challenge
Fast drying a wet winter building site
A little rain never hurt anyone but a lot of bad weather can spell time delays and budget blowouts for a construction site. Ashcourt called us when they found themselves behind schedule on the construction of four student accommodation buildings. The interior had been exposed to the extremes of a Durham winter causing site workers frustrations and delay.
Loading component...
The Solution
One modular mobile system for four buildings
We packaged up a 125 kW heater and ducting connected to a 30 kVA generator. This was linked to a 1,000 litre fuel tank to minimise the footprint. Because the equipment was modular and easy to move, we only needed one heater to dry out all four buildings.