Singapore Flyers Full View @ Blue hour landscape river

Providing Temperature Control And Temporary Power To Community Recovery Facilities In Singapore

  • The Challenge

    Rapid power and temperature control for temporary health facilities

  • The Solution

    11 MW of power and 2300 kW of cooling to create ideal environment

  • The Impact

    Swift delivery means patients receive care quickly

Client:Singapore Government

Location:Singapore

Sectors:Contracting

The Challenge

Rapid power and temperature control for temporary health facilities

Aggreko was tasked with providing reliable power and temperature control solutions to two of the community recovery facilities. The scale of the task was significant: the facilities can take in 300 patients each day, with a maximum capacity of an estimated 1,600 patients.

At the time of the outbreak, temperatures in Singapore could soar up to 35 degrees Celsius. That meant that the tents that formed the facilities could very quickly become unbearably hot and uncomfortable for both patients and healthcare workers treating the sick. Aggreko needed to put in place a temperature control solution which made the environment as comfortable as possible.

Lastly, given the increasing number of COVID-19 cases in the country, Aggreko needed to be able to deploy the power and temperature control solutions as quickly as possible so that the temporary structures could begin accepting the first patients. The response needed to be fast, effective, and reliable.

2,300kWOf cooling
11MWOf power
20Structures supported by our solution
7daysTime taken to deliver entire solution

Loading component...

The Solution

11 MW of power and 2300 kW of cooling to create ideal environment

The diversity of Aggreko’s fleet and the expertise of our engineers meant that we were able to rise to the challenge and quickly get to work designing a bespoke solution that would ensure the facilities were effectively powered and cooled.

Across two community recovery facilities, Aggreko has deployed 11 MW of power and 2300 kW of cooling to support 20 temporary structures in total. This bespoke solution was developed with the specific needs of the recovery facilities in mind.

,

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...