Client Gold Fields Australia

Location Laverton, Western Australia

Sectors Mining

The Challenge

Help our customer introduce renewables into their energy mix without compromising power reliability 

Gold Fields Australia committed to reduce its carbon footprint and use renewables for at least 20% of total life-of-mine power requirements in new projects.

Two years previous, after a gas line extension was built by AngloGold Ashanti to service their mining operations in the region, Gold Fields Australia were able to use gas, a cleaner cheaper fuel source than the diesel it was using at the time to power their operations going forward.

That’s when they turned to Aggreko to deliver a 22 MW gas power station. Working closely with them to understand their needs, we delivered highly efficient bespoke modified engines that reduced their fuel costs and environmental impact.

Knowing Aggreko had recently announced the launch of microgrids-as-a-service for customers who want to leverage the benefits of a hybrid energy solution while minimising capital outlay, discussions began about how and if this could be incorporated into their current power package without compromising the micro-grid stability or reliability.

Project fact file

2 MW

Battery storage

22 MW

Gas power

8 MW

Solar power

The solution

Leverage the benefits of hybrid energy and minimise capital outlay

To integrate 7.3 MW of solar power generation, and 2MW / 1 MWh battery storage with the existing gas supply as a hybrid power station – under one contract and with no capital outlay.

This unique energy package combines solar, thermal and battery storage that’s seamlessly integrated and managed by our powerful software platform - guaranteeing full system availability and optimising their existing thermal assets life.

This new solar gas hybrid power station will meet the increased daily power needs of the entire mine of 24.2 MW, with 8 MW allocated to the Wallaby underground mine and the remaining 16.2 MW for the processing plant, associated facilities and the mine accommodation camp.


The Aggreko Difference

Our ingenious solutions keep it simple for you

Can we help you dig deeper?

The impact

Lower energy costs and minimised environmental impact

Power generation is a significant proportion of operating costs of the Granny Smith mine for Gold Fields.

Using the latest hybrid energy technologies will enable them to significantly lower their total cost of energy and reduce their carbon footprint, while demonstrating their ongoing commitment to both environmental sustainability and innovation at its operations. All of this without compromising the reliability of power supply and productivity of the mine.