1387 AGG ME Shura island CS_Banner_LND

Power generation for a Red Sea island resort

Power generation for a Red Sea island resort

Client:Tiejun, a large-scale construction company

Location:Shura Island, Saudi Arabia

Sectors:Construction

THE CHALLENGE

Powering a remote island construction project

The luxury Shura Island Resort off the coast of Saudi Arabia needed a temporary power solution for the resort’s construction while their permanent solar power plant was still being built.

However, this remote island is home to several species of sensitive flora and fauna. So the project demanded a power solution that adhered to strict environmental
standards to protect these species.

Another challenge was powering the resort’s luxury waterfront villas, which required using a subsea cable. This presented technical difficulties, such as managing the high capacitive load over an extensive length. 

Tiejun contracted Aggreko to deliver reliable power to the resort without compromising the island’s pristine environment.

1 yearContract length
6 MWPower provided by Aggreko equipment
33 kVOutput from transformer setup
5Aggreko personnel executing the project