Data Centre

$name

Sharing the load: 400 load banks for generators help a data centre pass Level 5 ISAT tests

  • THE CHALLENGE

    Supplying 400 small, rack-type load banks for heat load testing

  • THE IMPACT

    Testing and commissioning ready to roll

  • THE SOLUTION

    400 load banks for data centre commissioning

Sectors:Data centres

Fact File

400Loadbanks
50{54AB4CCD-1FCB-4FBF-9F80-38FA9E7C93EA}To project completion
2.5{2DC79272-84A9-42C6-B29F-3276C50C2478}Of heat load required