Powering a world-class opening ceremony: multi-zone power delivery at Zayed stadium

Client
People
Location
Zayed Stadium, Abu Dhabi, UAE
Sector
Events

Overview

THE CHALLENGE

Deliver complex power infrastructure across a 400m stadium circuit against the clock

THE SOLUTION

A fully engineered multi-zone power system with 15km of Powerlock cabling supporting stage, roof, broadcast and operations

THE IMPACT

Reliable power, delivered at scale - enabling a seamless opening ceremony

2.5 MVA TOTAL SHOW POWER
1 MVA BACK OF HOUSE POWER
15 AGGREKO SPECIALISTS
15 km POWERLOCK CABLING DEPLOYED
250 kVA BROADCAST POWER

Loading component...