Industrial factory pipeline steel gas oil petroleum petrochemical turbine electrical refinery plant power energy equipment manufacturing. 3d rendering.

Contingency plan for a chiller pays off

Contingency plan for a chiller pays off

ClientDetailsClientLabelGulf Coast chemical manufacturer

ClientDetailsLocationLabelUSA

ClientDetailsSectorsLabelPetrochemical and refining

THE CHALLENGE

Speeding up replacement of a failed chiller

For our customer, failure of a critical chiller causes massive production shortfalls. In the past, we responded to emergency calls by getting the production line up and
running with a replacement generator and chiller.

But we knew that if we did some advanced planning we could reduce future response times. We suggested to the customer that we help create a contingency plan. It was a move that paid off eighteen months later when the chiller failed again.

18 monthsTime between chiller failures
1000 kWof power

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...