Powering a world-class opening ceremony: multi-zone power delivery at Zayed stadium
- Client
- People Creative
- Location
- Zayed Stadium, Abu Dhabi, UAE
- Sector
- Events
- THE CHALLENGE
Deliver complex power infrastructure across a 400m stadium circuit against the clock
- THE SOLUTION
A fully engineered multi-zone power system with 15km of Powerlock cabling supporting stage, roof, broadcast and operations
- THE IMPACT
Reliable power, delivered at scale - enabling a seamless opening ceremony
The challenge
Deliver complex power infrastructure across a 400m stadium circuit against the clock
People Creative required a dependable power solution to support a large-scale opening ceremony at Zayed Stadium and bring their production vision to life. The event demanded power across multiple
critical zones simultaneously, including the main stage, Back of House (BOH), drone display systems and broadcast infrastructure.
This was not a standard event set-up. Powerlock cabling had to be distributed across the full 400-metre stadium circumference, not only at ground level but also to the roof, spanning four levels at approximately 200 metres per level, and extending from a remotely positioned generator farm. Each connection point introduced additional complexity, and each cable run increased both technical
and operational risk.
The location of the generator farm added further challenge, requiring precise routing, careful load balancing and strict adherence to safety standards throughout. What mattered most was not simply supplying power, but delivering it accurately, safely and on time.
The timeline was equally critical. Initial power to the roof had to be live within five days to enable rehearsals to begin as scheduled. Any delay would have had a direct impact on the ceremony's production and creative timeline.