2023

$name

Precise load testing for a hydrogen-LNG hybrid gas turbine

Sectors:Utilities

Key Facts

18 Unitsof 6 MVA load banks
18 Unitsof 6.3 MVA transformers
2 xSwitch gears
2 xSeries reactors
12.3{0C9B3734-1D25-43A1-9A8A-C247ABB639CC}LV cable
4{0C9B3734-1D25-43A1-9A8A-C247ABB639CC}HV cable
Download PDF Case Study
2023

2023
Tags
  • Utilities
  • Case Study
  • Asia
  • Load banks