Manufacturing
When The Grid Fails, Backup Power Saves The Day
When grid failures threatened a South African manufacturer's furnace operations, Aggreko deployed 5MW of backup power in just one week. We prevented downtime and saved the customer from potential losses of 1 million ZAR per day over seven months.