THE CHALLENGE

Provide cooling to increase productivity

The Dubai Metro construction project was awarded to Dubai Rapid Link Consortium: Mitsubishi Heavy Industries and Mitsubishi Corporation for the rail work and for the civil work the Japan Turkey Metro Joint Venture consisting of Obayashi Corporation, Kajima Corporation and Yapı Merkezi.

The Tunnel Boring Machine (TBM) turns extremely hot while in operation. If it's not kept cool, the drill head will erode which will affect the drilling process, resulting in downtime.

THE SOLUTION

From hot to cold

Our technicians worked along with the contractors and developed a specially designed chiller system that recycled hot water from the Tunnel Boring Machine (TBM) and turned it into cold water to cool the machine itself. 600 kW water cooled chillers were used to ensure that the TBM machine worked continuously to excavate the tunnels through a variety of different rock layers.

the difference

Providing you with a comprehensive solution 

 

THE IMPACT

Tunnel excavation completed on schedule and a safe working environment.

Providing the customer with a comprehensive cooling solution enabled them to carry out the tunnel excavation which resulted in the tunnel being completed on time. And with the help of radiator units, we ensured that the workers working in the tunnel received clean and cool air, providing them with an optimal working environment.

After a site inspection and comprehensive assessment of our requirements, Aggreko developed a tailor made solution that would provide a comfortable working environment for the laborers who are working around the clock to meet the metro deadline.

Junichiro Nakayama Project Manager ,
Dubai, UAE

How can we help you?

Get in touch and we’ll help find what’s right for you