Emergency electrical power for a stranded offshore bulk iron ore carrier
Critical generator failure was preventing a bulk iron ore carrier from safely entering port to collect cargo. Aggreko provided an emergency solution by supplying and installing an on-deck power station. It consisted of four synchronized 320kVA generators, enabling the vessel to be back in operation and safely in harbour within just eight days.
- The Challenge
A failed generator left a bulk iron ore carrier stranded at anchor
- The Impact
The vessel back in operation and safely in harbour in just eight days
- The Solution
Supply and installation of 4 synchronised 320kVA generators
Client:A large shipping company
Location:Western Australia
Sectors:Shipping