The Challenge

Cost-effectively convert by-product into biofuel for power supply and avoid CAPEX

A leading energy company prides itself as a clean power enterprise that strives to improve the environment and lives of the local community, by leveraging on their proprietary technology in waste to biogas conversion.

The company was looking for a biogas power solution partner to convert their generated biogas – a potential 120,000m2 per day - through its waste biofuel technology. Purchasing equipment was their initial approach but the long-lead time and high CAPEX was an issue.

It meant that the business had to wait, and delays mean lost revenue.

$1mUSD saved
120,000Nm3biogas converted per day
40,000 Cars Equivalent emission reduction
4xGas generators
6MWInstalled capacity

Loading component...

The Solution

Responsive, versatile, fuss-free and cleaner biogas power solution

Our customer approached us to help them, because we are known for our responsive approach to complex power demands.

We designed an adaptable package comprising four of our gas generators with an installed capacity of 6 MW. When designing the solution, we ensured full flexibility so the customer could scale up or down operations and capacity too.

This approach also included 2 MW of redundancy built-in, allowing for a flexible approach also where volume increase was concerned – as well as the opportunity to produce more clean energy for their customers.