Contingency plan for a chiller pays off

Contingency plan for a chiller pays off

Client:Gulf Coast chemical manufacturer

Location:USA

Sectors:Petrochemical and refining

THE CHALLENGE

Speeding up replacement of a failed chiller

For our customer, failure of a critical chiller causes massive production shortfalls. In the past, we responded to emergency calls by getting the production line up and
running with a replacement generator and chiller.

But we knew that if we did some advanced planning we could reduce future response times. We suggested to the customer that we help create a contingency plan. It was a move that paid off eighteen months later when the chiller failed again.

18 monthsTime between chiller failures
1000 kWof power
Air-cooled chillers, clinical trial facility, Groton, Connecticut, America

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...

Loading component...