Data Center Construction

Comprehensive data centre construction support with temporary power, battery storage, temperature control, and loadbank testing solutions. We deliver greener construction strategies and decentralised energy solutions from start to finish.

Power, heat, dry and cool your data centre build.

You can’t always rely on the grid to power all your construction, heating, drying and climate control needs. But you can always depend on our mobile and modular solutions.

How can we support data centre construction?

  • We can provide prime power when there is no grid connection
  • We can synchronise our generators and batteries to the grid
  • Panels, transformers and switchgear distribute the power where it is needed
  • Innovative heat load testing packages minimise costs and impact on the environment
  • Super silent generators, manufactured with sound-proofing and noise-reducing measures for urban areas
  • Use our climate control solutions to cure the concrete, dry walls and keep areas dust-free
  • Maintain humidity levels for safe installation of critical equipment and protection of equipment warranties
  • Temperature control equipment keeps workers comfortable and safe