Constant power and cooling allow production to continue
Client: International beverage producer
Location: Papua New Guinea
Sectors: Food and Beverage
The Challenge
Reliable cooling and power to ensure 24/7 production continues
CCA Lae are located in remote Papua New Guinea. It means that their production facility relies heavily on the grid. When the grid provides intermittent power, this impacts their business.
With production running at full capacity, 24/7, 365 days a year – there was no room for lulls in supply. But the grid couldn’t sustain the level of power that CCA Lae required – and this hindered the company financially.
The site also had issues with critical cooling equipment during the production process – if the correct temperature couldn’t be maintained then entire batches would be lost.
CCA Lae needed to find a solution that could provide the correct cooling and power – and without any margin for error.
Project fact file
The Solution
Precise air-cooled chiller solution and modular power for entire plant
Our experts devised a tailored solution that would create the optimal temperature for production to continue unabated. We delivered two of our 800 kW air-cooled fluid chillers to replace the current equipment our customer had. This ensured set-point temperatures, the desired reliability and hassle-free manufacturing at their plant.
To overcome the grid unreliability, we installed two of our thermal generators on site. Our equipment is mobile and modular as standard, so there were no issues with site space nor installation. We soon had our customer hooked up to our dependable power so they could concentrate on their core business.
Down the track, due to changing customer demands, we ramped up the cooling capacity to 4 x 800kW chillers backed up by 6mVA of power. The contract was also extended increasing to 8 years.
The Impact
Entire plant cooling and power now reliable and losses minimised
Our solutions were successful in halting the intermittency that had plagued the customer's production line. Their site required 24/7 operations – and that is exactly what our equipment and experts provided.
This meant that losses that were incurred with the previous solution were now dramatically lessened, easing the worry for CCA Lae.
Our customer was so happy with the result that we now power and cool the entire facility. Our modular equipment also allows CCA Lae to increase their power or cooling should they need to – meaning that our involvement is the ideal partner for success.
Following the successful installation at CCA Lae, Aggreko also installed 1 MW of power and 1 x 600kW chiller at the CCA Port Moresby facility to support the production of carbonated soft drinks.